top of page

Meno Ya Win Health Centre Hospital

Meno Ya Win Health Centre Hospital

Sioux Lookout, Ontario

COMPLETED: 2010

CONSTRUCTION VALUE: Supply & Install = $900,000

SPECIES: Solid Heavy Timber

PROJECT MANAGEMENT: Ellis Don

ARCHITECT: Stantec

 ENGINEER:  Burnside

SCOPE: Engineering design for connections, erection and fabrication drawings. Full fabrication in the shop and field erection. Bryte Designs was able to redesign the gathering area roof to feature a timber deck in lieu of a metal roof and achieving a saving at the same time.

AWARDS:  Won the Wood Works institutional award (Over 10 Million,2010)

100.gif
DSC00169-1024x768
sl-01
DSC00196-1024x768
DSC00184-1024x768
DSC00176-1024x768
DSC00186-1024x768
DSC00170-768x1024
252fa7daa25679
Untitled-1
DSC00168-1024x768
11_07_10_1657
DSC00167-1024x768
2-570x264
bottom of page