top of page
ErinoakKids Centre
ErinOakkids Center-P3 Project
Kids Treatment Facilities
Brampton, Ontario
Mississauga, Ontario
Oakville, Ontario
COMPLETED:2017
CONSTRUCTION VALUE:Supply&Install $3.2 M
SPECIES:Spruce-pine
GENERAL CONTRACTOR: Bondfield
ARCHITECT: Stantec
ENGINEER: Bryte Designs (Timber)
SCOPE: Bryte Designs is the engineer designate for the timber structures and design of Glulam columns,beams and GLT panels. The design,fabrication and installation happened simultaneously at all 3 locations. Buildings featured 2 storeys height main corridor,
gymnasium, swimming pool, respite area and front canopies.
bottom of page