top of page
Burlington Skyway Arena
Burlington Skyway Arena
Burlington, Ontario
COMPLETED: 2023
CONSTRUCTION VALUE: $300,000
SPECIES: Spruce Pine
GENERAL CONTRACTOR: Norlon Builders
ARCHITECT: Lennox Architects
ENGINEER: LEA Consulting
SCOPE: Installation of Glulam structure. Columns and beams and associated steel connections and hardware. The design features 106ft glulam girders.
Also, the installation of the structural steel roof cross braces and steel connections inserts into the glulam columns that connects the structural steel beams to the glulam columns.