top of page

Burlington Skyway Arena

Burlington Skyway Arena

Burlington, Ontario

 

COMPLETED: 2023

CONSTRUCTION VALUE: $300,000

SPECIES: Spruce Pine

 

GENERAL CONTRACTOR: Norlon Builders

ARCHITECT: Lennox Architects 

 

ENGINEER: LEA Consulting 

 

SCOPE: Installation of Glulam structure. Columns and beams and associated steel connections and hardware. The design features 106ft glulam girders.  
Also, the installation of the structural steel roof cross braces and steel connections inserts into the glulam columns that connects the structural steel beams to the glulam columns.     

IMG_0247
IMG_0253
IMG_0261
IMG_0368
IMG_0286
IMG_0238
IMG_0181
IMG_0180
bottom of page