PROJECT: Burlington Go

Burlington, Ontario

COMPLETED: 2017

CONSTRUCTION VALUE:$600,000

SPECIES: Douglas Fir sawn heavy timber

GENERAL CONTRACTOR: Bondfield

 

ARCHITECT: Strasman Architects

ENGINEER: Brown & Co Engineering

Integrated with Entuitive (2019)

Scope: Bryte designs engineering of connections of sawn heavy timber trusses and roof framing and decking of train station. Scope includes installation of building framing and exterior canopies.   

 

 