Bracebridge Muskoka Lakes CC

Bracebridge Muskoka Lakes Community Centre

Bracebridge, Ontario

​

COMPLETED: 2007

​

CONSTRUCTION VALUE: Supply & Install $450K

​

SPECIES: SPF Glulam

​

GENERAL CONTRACTOR: Bondfield Construction

​

ARCHITECT: CS&P Architects Inc., Allen & Sherriff Architects

​

ENGINEER:  Halsall Associates

​

SCOPE: Engineering design for connections, erection and fabrication drawings. Full fabrication in the shop and field erection.  Bryte Designs was able to redesign steel outriggers to replace with heavy timber and achieving a saving and erection efficiency at the same time.